Utility Trailer retained Big- D to construct a 500,000 sq.-ft. heavy-duty manufacturing facility in Clearfield, Utah. At 1,460' long and 300' wide, the facility is the largest "frame-to-finish" refrigerated trailer manufacturing plant in the world. With 14 overhead doors at each end of the facility, raw materials enter through one end, and exit as finished refrigerated trailer boxes at the other end.
The structural steel building with pre-engineered skin houses over 2 miles
of assembly lines — one standard and one custom. The facility contains
10 overhead monorails, 23 overhead cranes, 3 paint booths, 3 foam injection
rooms, and 20,000 sq.-ft. of office and lunchroom space.
| Utility Trailer | |
| Total Size: | 500,000 square feet |
| Duration: | 12 months |
| Location: | Clearfield, Utah |