Fremont County Detention Center Expansion

Fremont County Detention Center Expansion
  • Market Sector
    Government & Public
  • Size
    13,233 SQ. FT.
  • Project Location
    St. Anthony, Idaho
  • Company
    Construction
  • Description

    The Fremont County Detention Center Expansion Project was a significant undertaking aimed at enhancing the existing Sheriff’s and Jail facilities and the first major upgrade for the jail since its original construction in 1981. The project encompassed the construction of a new single-story, 11,800-sq ft expansion which included a second-floor connector linking to the existing courthouse’s second floor. The structure was built using CMU block construction, structural steel beam, and cast in place concrete ceilings. The exterior was carefully planned to complement the existing buildings, incorporating materials like brick veneer, stone, CMU, and flat roofs. A backup generator was installed to ensure continuous power supply during outages, and the building was equipped with advanced security systems.

    Designed to accommodate two 20-bed pods with multi-occupant cells and four solitary holding cells, the expansion included essential areas such as exercise yards, dayrooms, a control room, booking area, kitchen, and a vehicle sallyport. Additionally, shell space of approximately 1,900-sq ft was allocated for the County to provide new space for Dispatch.

key contacts